Saturday 23rd The last 5 weeks have been very productive but unfortunately August has not included any time to go out on the boat so far. This evening we moved the lounge furniture into the extension as we are about to start using the new kitchen properly. There are still a few jobs before I can claim to have finished but I think we are something like 98% done.
| 5 Weeks ago.
Fresh plaster drying on walls and ceiling.
|
This evening.
Kitchen operational and floor completed.
|
Hopefully that will mean I can make a little time to go sailing before we set off to France for 3 weeks of packing away tents and other equipment.
First posted 23rd August.



